A building permit rarely hands an electrician or a solar installer a lead directly, because the contractor on the permit is usually already hired. What it gives you is the next buyer: the general contractor who will need an electrician on the next job, a tenant build-out that has no electrical permit yet, or a building owner whose roof has just been replaced and is now a candidate for rooftop solar. This page is about commercial work (offices, retail, warehouses, multifamily and industrial buildings) and explains what the public data holds, how to turn rows into named buyers, and what the rules are for using it.

The general method is in building permit leads. Here is what is specific to electrical and solar.

What the open data actually contains

Two city portals show how much a permit record can hold. Both descriptions come from the portals' own dataset metadata, read on 15 November 2026.

  • Chicago, "Building Permits" (data.cityofchicago.org). Permits issued from 2006 to the present, excluding those voided or revoked after issuance, updated daily. Columns include the permit type, status, issue date, a work description, fees, and numbered contact fields with a contact type, name, city, state and ZIP.
  • New York City, "DOB Permit Issuance" (data.cityofnewyork.us). The Department of Buildings says each row is the life cycle of one permit for one work type, updated daily. Columns include job type, work type, permit type, issuance date, the permittee's business name and license type, and the owner's business name and business type.

The New York detail matters for electricians. Because each work type gets a separate permit, a building can show a general construction permit with no electrical permit yet. That gap is not proof anyone needs an electrician, but it is a useful signal that the electrical scope may not have been awarded. Other cities arrange their data differently, so look at your own city's portal or building department page.

Four angles for electrical work

  • Tenant build-outs with no electrical permit yet. The applicant is a general contractor. The person you want is its estimator or project manager.
  • The general contractors who pull many permits. A contractor named on many commercial permits in a quarter needs reliable electrical subs. Ask to be on its bid list.
  • Panel and service upgrades on commercial buildings. The owner or property manager is a repeat buyer for the building's other work.
  • The building owner of a permit you did not win. If another electrician is on a permit, the owner's other buildings are still open.

Four angles for solar installers

  • A recent commercial re-roof. A roof just replaced is a roof the owner expects to keep for years, which is when rooftop solar fits.
  • Large flat roofs on warehouses and retail. The owner entity named in the record leads you to the property manager or the owner's facilities lead.
  • Existing solar permits. Neighboring owners in the same park or corridor often have the same roof type and the same utility.
  • Building additions and new construction. The developer or its owner entity has a design window open.

A permit tells you what is happening, not what the owner wants. You still write to find out. How to get commercial clients for an electrical business covers who buys this work, and cold email templates for solar companies has more first-email samples.

A worked example

Take a fictional electrical contractor that does tenant work; call it Contractor A. In one pull of its city's portal for commercial alteration permits issued in a month, suppose (all assumptions) there are 300 rows. Filtering out residential rows and anything outside its service area leaves 120. Of those, 40 have a general contractor named and no electrical permit yet.

  • 40 general contractors named, one name each.
  • Suppose 1 in 20 of the 40 invites Contractor A to bid: 2 invitations.
  • Suppose 1 in 4 bids wins: half a job in the month, so 1 job in two months.
  • At an average job of $18,000 in revenue, a job in two months is $9,000 a month on average.

The point is the shape: 300 rows narrow to 40 companies, and each one is a company that makes a decision; the next step is finding the estimator there by name. If 1 in 40 invites a bid, the result is 1 invitation, and a month is not enough to judge. Pull again and compare.

The first email to a general contractor

Subject: Electrical sub for the Larch Street build-out

Hi {{first_name}},

I saw the permit for the tenant build-out at 410 Larch Street. We are a licensed commercial electrical contractor that does tenant work in this part of the city, and I wanted to ask whether you take bids from new electrical subs on projects like that one. I can send our license, insurance certificate and three recent tenant jobs.

Who handles electrical bids at your company?

[Your company name], [street address, city, state, ZIP]

If you do not want emails from me, reply "stop" and I will not write again.

It names the permit plainly, says what the sender does, asks one question and carries a postal address and an opt-out. The FTC's CAN-SPAM guide (read 15 November 2026) requires a valid physical postal address and a clear opt-out in a commercial email, says opt-outs must be honored within 10 business days, and says the law makes no exception for business-to-business email. The rule is in 16 CFR Part 316.

The rules for using permit data

  • Public records. Florida's public records statute, section 119.01(1) (read 15 November 2026), says state, county and municipal records are open for inspection and copying by "any person," and it puts no condition on the reason. Other states' public records acts were not read for this page and differ on fees, timing and what is withheld. For a bulk request or older records that are not on the portal, file a request under your state's act.
  • The portal's terms. Use the portal's own export and follow its terms. Chicago's metadata points to its terms of use. Do not aim a scraper at a portal that provides an export.
  • Privacy law. The California Attorney General's CCPA page (read 15 November 2026) says personal information does not include publicly available information and that the business-to-business exemption expired December 31, 2022. It covers only businesses over its thresholds. Check your state's definitions if you hold the data in bulk.
  • Residential permits. Many permits are for homes. Residential owners are consumers and fall under different rules for calls and texts. Filter them out, and do not use this method for homeowners.

Turning a name into a person you can email

A permit gives you a company: the contractor, the owner entity. The person is the next step, and the company's own site, the state contractor license lookup or a call to the front desk can give you the estimator's name. You can also come at it from the other end. Rocketship does not read permit portals; you describe the buyer ("general contractors and property managers in Chicago, the buyer is an estimator or facilities manager") and it finds named people with an email, emails them from your Gmail, answers replies and books the meeting. Contractor A's 40 would be 160 credits at 4 a person, inside Starter's 250 ($12 a month; every plan starts with a 7-day trial that takes a card; see pricing). The license, the insurance and the bid stay yours.