A commercial kitchen installation crew is hired for dates. A restaurant group has a lease and an opening day, a dealer has sold a kitchen package with a delivery schedule, and a design-build firm has promised a handover. The crew that wins the work is the one that can show up on the day equipment arrives, set it to the approved plan, coordinate the licensed trades for gas, water and power, and leave a kitchen that passes the health department's inspection. Say that in your first message and be specific about which crews, how many and when.
Who hires an installation crew
| Buyer | Why they hire you | What they need to hear |
|---|---|---|
| Foodservice equipment dealer | Sells the equipment package and needs someone to set it, level it and connect it, often on many jobs at once | Your crew size, your territory and your insurance; that you will work from their drawings and equipment list |
| Restaurant group opening locations | The development or construction manager has a lease, an opening date and a vendor list | That you can take a site on the opening calendar and report to the construction manager daily |
| Design-build firm or kitchen designer | Hands the owner a finished kitchen and subcontracts the install | That you read plans, flag conflicts early and keep the schedule |
| General contractor on a larger build | The kitchen is one scope inside a project | That you can work with the other trades in a tight window |
Our pages on getting restaurant equipment repair accounts and getting restaurant hood cleaning customers cover the service side of the same buyers; the installation side starts earlier, when a location is still a lease and a plan.
What the plan review means for your crew
The FDA Food Code, a model offered for adoption by local, state and federal governments, is the base for many health department rules, and states and localities adopt and change it in their own ways, so use your jurisdiction's version. The 2022 model requires a permit applicant to submit plans and specifications for review and approval before constructing a food establishment, converting an existing structure to one, or remodeling one when the regulatory authority decides plans are necessary (section 8-201.11). The plans are to show, as the authority requires, the proposed equipment types, manufacturers, model numbers, locations, dimensions, performance capacities and installation specifications (section 8-201.12).
For a crew, that means the equipment you set should match the equipment on the approved plan, in model and in place. If a dealer substitutes a different model because of a delay, the change may need approval before the inspection. Ask for the approved plan set on the first day and keep a copy on site.
Installation itself is covered by the same model. Fixed equipment that is not easily movable must be installed so that it is spaced to allow access for cleaning along the sides, behind and above it, spaced from adjoining equipment and walls no more than 1 millimeter or one thirty-second inch, or sealed to adjoining equipment or walls if exposed to spillage or seepage (section 4-402.11). Floor-mounted equipment that is not easily movable must be sealed to the floor or raised on legs giving at least 15 centimeters (6 inches) of clearance, with a 10 centimeter (4 inch) allowance when no part of the floor under the equipment is more than 15 centimeters from the point of cleaning access (section 4-402.12). Food equipment certified or classified for sanitation to a recognized American National Standard by an ANSI-accredited program is deemed to meet the Code's equipment design parts (section 4-205.10). Put those checks on your punch list, and say in your proposal that you install to the jurisdiction's adopted code.
Scope lines to write into a quote
- Receive and inspect: who signs for deliveries, who photographs freight damage and who files the claim.
- Set and level: placement to the plan, anchoring, sealing or legs as the code and the manufacturer require.
- Connections: your own licensed trade or a named subcontractor for gas, water, drain and electrical, and who pulls permits. Licensing rules differ by state and city; check yours before you quote any connection work.
- Hoods and fire suppression: whether you set them, who does the exhaust and make-up air, and who certifies the fire suppression. Local fire and mechanical codes apply; ask the fire official whether the local code adopts NFPA 96, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations, and which edition, before you quote hood work.
- Start-up: who runs each piece for the first time, with the manufacturer's service tech where the warranty requires it.
- Punch list and inspection support: a list at the end of each day and a person present for the health department visit.
- Exclusions in writing: wall and floor repairs, demolition of old equipment, haul-away and anything the plan leaves to others.
Pricing by the piece, by the day or by the job
A dealer may price by the piece or by the package, because it quotes the whole kitchen. A restaurant group or design-build firm may want a lump sum for the kitchen scope. Whichever you use, show the arithmetic from your own labor: crew hours per piece type, travel, and the margin you keep. An invented example of the form follows. A crew of three costs 195 dollars an hour loaded for the three. A line of eight pieces needs two days of ten hours, which is 20 hours, or 3,900 dollars, plus a day of punch list and start-up support of 8 hours, 1,560 dollars, for a quote base of 5,460 dollars before margin and any trade subcontractors. The figures are made up. The point is that you can show a dealer how a price is built, and they can compare it with another quote.
A calendar that fits openings
Restaurant groups plan openings ahead and may not publish the dates. The signs you can see are a lease announcement, a building permit for a tenant improvement, a liquor license application, and hiring posts for a new location. Our page on building permit leads shows how to find the permits. Ask each construction manager for the next three openings and the point at which equipment is ordered, because the crew has to be on the list before the order is placed.
Offering a crew to a foodservice dealer
Subject: An installation crew for your Oklahoma City kitchen packages
Hi Gabriel, I run Ketterick Equipment Installation, a crew of five that sets and connects commercial kitchen packages for foodservice dealers in the Oklahoma City area. If your installers are booked when a restaurant group wants a kitchen set before its opening date, I can take a package on a set date and work from your plan and equipment list. I can send our insurance certificate and two crew photos of a finished line on request. Who schedules installers on your side?
Tobias
Ketterick Equipment Installation, [street address, city, state, ZIP]
If you would rather not get emails from me, reply "stop" and I will remove you.
The email says what you do, when you help and asks who schedules. It claims no results, and it offers an insurance certificate only if your coverage is current. Add a reference only if a dealer has agreed to be named.
Four weeks of dealer and design firm outreach
- Week one: list every foodservice equipment dealer and kitchen design firm within a day's drive, and the construction or development managers of restaurant groups opening in your region.
- Week two: send the email to ten a week and log replies.
- Week three: follow up once with one useful item, such as a one-page sample scope.
- Week four: for every dealer that replied, offer a one-job trial with a set date, a written scope and a punch list at the end.
Our page on selling to equipment and machinery dealers covers how dealers buy services like yours from another angle.
Dealers and construction managers need writing to every season, and in a busy installation season that is the work that gets skipped. Rocketship keeps that writing going while your crews install: Emma finds dealer operations managers and construction leads in your region, reads each company's website, sends the note from your Gmail and books the calls. Test it on next season's dealer list with a 7-day free trial on every monthly plan, card required; the pricing page has the plans.