Construction final cleaning is won by the project manager or superintendent at a general contractor, usually near the end of a job, and it is priced per square foot with a schedule tied to the punch list. A cleaning company wins by getting on the GC's bid list before the building is enclosed, quoting the phases separately, and showing it can staff a crew on a day's notice.
This page is about the construction-side contract: the GC as buyer, the turnover deadline and the payment chain. For the broader post-construction market see post-construction cleaning clients, and for owner-side recurring cleaning see commercial cleaning clients.
Three phases, three prices
| Phase | When | What it covers |
|---|---|---|
| Rough clean | After drywall and framing, before finishes | Debris, dust, sweeping, vacuuming, readying floors for trades |
| Final clean | After finishes, before turnover | Surfaces, fixtures, glass, floors, cabinets, bathrooms |
| Touch-up clean | After the punch list, before the owner walk | Dust and marks from final repairs, last-minute checks |
Quote all three as separate lines even if the GC asks for one number. The touch-up is where schedule risk lives, because the punch list ends late and the owner's walk date does not move. A GC who sees the three lines can choose which to buy and which to do with their own labor, and a cleaner who lumped them together will be asked to defend a lump sum.
How to price by square foot
Final cleaning is priced per square foot of the area to be cleaned, adjusted for finish level, glass, number of restrooms and floor type. To get your own numbers, time two or three real jobs: the crew size, the hours, the square feet. Divide labor hours by thousand-square-feet to get your production rate, then price from your loaded labor cost plus supplies, equipment, supervision, insurance and margin. ISSA, the cleaning industry association, publishes "The Official ISSA Cleaning Times" (2021 edition) as a reference for task times, which is a useful check on your own timings but not a substitute for them. Here is a worked example with invented figures:
- Area: 24,000 square feet of tenant space, medium finish, 6 restrooms.
- Your measured rate for similar work: 22 labor hours per 1,000 square feet for the final clean. That is 24 x 22 = 528 hours.
- Loaded labor at $26 an hour: 528 x $26 = $13,728.
- Supplies, equipment and supervision add $2,900; insurance and overhead add 12 percent of the subtotal; margin is your own target.
The inputs are made up to show the steps. Use your own rate and costs. The other rule is to walk the building, or at least study the drawings and finish schedule, before you quote. A building with a lot of glass or specialty floors is not the same job as a flat office.
Getting on the GC's list
GCs choose cleaners the same way they choose other subs: by who they know, who is insured and who answered the bid invitation. Build the list from the places GCs announce work: permit records, project boards, and the awards pages of owners and architects. See finding general contractors to sell to. Write to the project manager or superintendent and the estimator, and include insurance certificates, your safety program and a page of recent turnover jobs.
Safety and insurance on a live site
You will work around trades finishing the building, so GCs ask for your safety orientation records, a site-specific safety plan and proof of workers' compensation and general liability, often with the GC named as additional insured. Prepare a standard packet and update it each year. A cleaner who arrives with the paperwork saves the GC a delay, which is more valuable than a lower price.
How the payment chain works
A GC pays subcontractors after the owner pays the GC, so payment often comes 30 to 60 days after invoice, with a retainage held until the end of the job. State laws set prompt-payment rules and lien rights for private projects, and the notice deadlines are strict, so ask your state's contractor board or a construction lawyer what you must send, and when, to keep lien rights. On federal construction contracts, the Prompt Payment Act (31 U.S.C. 3905(b)) requires a prime contractor that has been paid to pay its subcontractors within 7 days. Whatever the rule, invoice the day a phase ends, with photos, and put the payment terms in your quote.
A first email to a superintendent
Subject: Final cleaning for the Harlan Street medical suite
Hello,
County permit records show the Harlan Street medical suite buildout finishing this winter. Larkspur Cleaning Crews does rough, final and touch-up cleaning for general contractors and can start a crew within two days of your call.
May I send our insurance certificate and a quote split into the three phases? Who handles cleaning subs on this project?
Imani Brooks
Larkspur Cleaning Crews, [street address, city, state, ZIP]
If you would rather not get emails from me, reply "stop" and I will remove you.
It cites a public record, states a start time the crew can meet, and asks who handles subs. For quote follow-up wording, see follow-up after a bid submission.
Permit-driven lists change every week and each project has a short window. Rocketship finds project managers and superintendents by name, writes from your own Gmail, follows up and answers replies, and books calls and site visits. The pricing page lists the monthly plans, and there is a 7-day free trial on every monthly plan, card required.