Firestopping and fireproofing are bought by general contractors and, for firestop, often by the mechanical, electrical and plumbing subs whose pipes and cables create the openings. To win the work, get on bid lists before the project is awarded, show a qualification package the GC can drop into its prequalification file, and be reachable when the penetrations are ready for you, which is later than the bid. The sale is made on documentation, safety and schedule reliability, and the price follows.

What the two packages are

The terms get mixed, so be exact when you write. Firestopping seals openings and joints in fire-rated walls and floors where pipes, cables, ducts and structural joints pass through, using tested and listed systems, so a fire does not spread through the opening. Fireproofing, often sprayed or applied as coatings or boards, protects structural steel so it keeps its strength longer in a fire. In specifications they often sit in separate sections, and some projects buy them from one sub and some from two. Read the sections before you bid, and read the drawings that mark the rated assemblies.

Who buys, and how each one sees you

BuyerWhy they buy from a specialty subWhat they check
General contractor, preconstruction managerThe package is in the project's scope and must pass inspectionPrice, qualifications, safety record, capacity for the schedule
General contractor, project manager and superintendentThey need the work done so inspectors can sign off and the ceiling can closeWhether you show up when called, and whether your paperwork is complete
Mechanical, electrical and plumbing subsTheir penetrations need sealing; some contracts push that to themPer-penetration pricing and quick response
Building owners and facility managersRepairs after tenant work, renovations and retrofitsDocumentation of what was sealed, where

The qualification package

  1. Company profile: years in business, markets, typical project size, number of trained installers.
  2. Safety record: your experience modification rate and recordable incident data as your insurance and OSHA logs show them, and your written safety program. Safety numbers can be the first filter at a general contractor.
  3. Insurance and bonding: certificates, with the limits the GC lists in its subcontract.
  4. Installer training: records showing who has been trained by the product manufacturers whose systems you install.
  5. References and project list: recent jobs with contact names, ideally with a similar occupancy and size.
  6. Sample submittals and documentation: a model of what you hand over: product data, the listed system numbers you install, installation details and the log or labeling you leave in the building. A GC that sees organized paperwork believes the work will be organized.

Inspection is the reason the paperwork wins

On many projects, firestop and sprayed fireproofing must be inspected before they are covered, and the inspection may be by a special inspector hired by the owner and not by the city inspector alone. The project's drawings or its specification sections say which inspections apply, and the adopted building code and local amendments set the rules, so read both for each job. For the sub, the consequence is simple: if the inspector cannot find your records, or the system installed does not match a listed system, the work stops and the schedule suffers. A sub that makes inspection easy, with a log, labels and a ready contact, gets called again.

When to call: the project timeline

  • Bid stage: get on the invitation list. See how to get on general contractor bid lists.
  • After award: the GC buys out subcontracts in the first weeks; the project manager is the contact. Finding the project manager on a construction project shows where the name appears.
  • During rough-in: penetrations appear as trades install. Offer walk-throughs and a per-penetration price for the pieces that were not in the base bid.
  • Before ceiling close-up: the final inspection window. Be ready to respond within a day.

Asking a preconstruction manager for a place on the list

Subject: Firestopping and fireproofing for Elkcombe Construction's next healthcare bid

Hi Yusuf,

I saw Elkcombe Construction was awarded the surgical addition at the regional hospital. Tarnlock Firestop installs firestopping and sprayed fireproofing on healthcare and institutional projects. I would like to be on your invitation list for the passive fire protection packages, and I can send our qualification package, with safety data, insurance certificates and a sample submittal, so your team can add us to the prequalification file.

Nora
Tarnlock Firestop, [street address, city, state, ZIP]

If you would rather not get emails from me, reply "stop" and I will remove you.

The email names a recent award the sender can see in public news, states the work, and asks for one thing: a place on the list. It offers the package on request. Say "healthcare" only if you have healthcare experience. See how to sell to specialty subcontractors and how to get data center construction subcontracts for the neighboring paths into GC relationships.

Keep the work: what a general contractor remembers

  • You answered the phone and showed up when the schedule moved.
  • The inspector never had to wait on you.
  • Your change order for an unexpected penetration came with photos and a number the same day. See the scope creep email for wording.
  • Your closeout documents were complete on the day they were due.

Getting onto bid lists means a short, specific note to many preconstruction and project managers, each one naming a real award. Rocketship writes those notes: Emma finds general contractors and their project teams by title, industry and place, reads each company's website, emails from your own Gmail, answers replies and books meetings on your calendar. Write to the general contractors behind this month's awards during a 7-day free trial on every monthly plan, card required, and see the pricing page for plans from $12 a month.