Utilities are slow, risk-averse buyers with large budgets, and almost every purchase passes through procurement and often a regulator. A supplier gets in by solving a problem the utility already tracks (outage minutes, leak losses, safety incidents, customer calls), by proving it in a small pilot and by getting onto the approved-vendor list before anyone issues a request for proposal. Plan for 12 to 24 months from first email to a contract that matters.
Know which kind of utility you are selling to
| Type | Who oversees it | What that means for you |
|---|---|---|
| Investor-owned utility | State public utility commission | Spending is tied to a rate case; projects need a cost-recovery story |
| Municipal utility | City council or a utility board | Public bidding rules and board meetings; the council sees every contract above a threshold |
| Electric cooperative | Member-elected board | Smaller teams, shared purchasing through a statewide or national association |
| Water and wastewater district | Local board and state health or environmental agency | Compliance deadlines drive spend; grant and loan funds shape timing |
Every state sets its own rules for regulated utilities, so check your target state's public utility commission website for how capital projects and pilots get approved. Public and municipal buyers must follow their jurisdiction's procurement code; read the purchasing policy on the city or district website before you write.
The people in a utility
- Engineers and operations managers feel the problem and decide whether a technology is worth testing.
- Innovation or emerging-technology groups exist at larger utilities and run pilots. They are the best first contact for something new.
- Supply chain or procurement controls vendor registration, terms and bidding. They do not choose the technology but can stop a deal.
- Regulatory and legal staff decide whether a project can be recovered in rates or needs an approval.
- Safety, cybersecurity and IT review anything that touches the grid, a SCADA system or customer data. Expect a security questionnaire.
For the procurement side, how to sell to procurement and how to sell to city governments are close companions, since municipal utilities follow public buying rules.
Four ways in, in order of speed
- Register as a vendor now. Most utilities run a supplier portal. Registration is slow and dull, and a vendor not on the list cannot be paid. Do it before you pitch anything.
- Ask for a pilot, not a purchase. A 90-day pilot on one feeder, one pump station or one call-center queue, with a success measure the utility chose, is the usual first contract.
- Sell through a prime or a larger vendor. Utilities already buy from engineering firms and equipment makers; being in their bid is easier than being alone.
- Attend the industry meetings the utility staff attend. Regional associations and state water or electric conferences are where the engineer sees your name before your email arrives.
A first email to an emerging-technology manager
Subject: a 90-day pilot on leak detection for Marlow Water District
Hello Ms. Obuya,
I read in the district's board minutes that non-revenue water was 17 percent last year and that the board asked staff for options. We make acoustic leak sensors that attach to valves, and in a pilot with a utility of similar size they located 11 leaks in 8 weeks.
We would like to propose a 90-day pilot on one pressure zone at our cost, with a success measure you set. May I send a two-page pilot outline?
Thank you,
Tomas Brennan
Clearflow Sensors, [street address, city, state, ZIP]
If you would rather not get emails from me, reply "stop" and I will remove you.
That email uses a public source (board minutes) to show the problem is already on the district's agenda, offers something small and states a result from a comparable utility. Replace the figures with your own, and do not use a number you cannot document.
What the pilot agreement should say
- The one measure that defines success, written by the utility, and the data you will collect.
- Who owns the data and what you may say about the pilot afterwards. Many utilities do not allow naming them without approval.
- What happens on day 91: a price for scale-up, a written next step or a clean stop.
- Insurance, site safety and access rules, which you should ask for before you spend on hardware.
What the security review will ask
Anything connected to operations technology or customer data draws a security questionnaire, and the first one takes weeks. Prepare answers in advance: where data is stored, who can access it, how you handle a vulnerability, whether you have a third-party audit and how you control remote access to a device on their network. Electric utilities that own or operate parts of the bulk power system must meet the North American Electric Reliability Corporation's mandatory reliability standards, approved by the Federal Energy Regulatory Commission under section 215 of the Federal Power Act. The Critical Infrastructure Protection (CIP) standards cover cyber security, and CIP-013 requires the utility to manage supply chain risk from its vendors, so a product that touches those systems will be asked about it by name. The standard binds the utility, not you, but its questions arrive in your contract. If you do not know whether your product falls under those rules, ask the utility's compliance staff early, because the answer changes who has to review you.
Following up in a slow buyer
A silence of six weeks at a utility is normal, not a no. Board calendars, budget cycles and storm season all stall replies. Write every three to four weeks with something that adds: the pilot outline, a third-party test report, a reference from a similar utility. After a pilot, send the results within two weeks while the champion still has attention. For how to keep the rhythm without nagging, see how often to follow up with leads.
This market rewards the supplier who keeps showing up. Rocketship gets you customers: Emma finds the engineers and emerging-technology managers by name, emails them from your own Gmail, follows up and books the meetings. See pricing.