An industrial IoT company does not sell sensors by email. It sells a pilot on one machine line that a maintenance or plant leader can judge in weeks, and it uses the outbound to find the right plant and the right person for that pilot. If your hardware and software are ready for a first install, the outbound job is a short list of plants with a problem your pilot can measure, a different message for each of three buyers, and a clear path from pilot to rollout.

The pilot is the offer, the rollout is the revenue

Write the pilot down as a one page offer before sending anything. It needs a bounded scope (one line, one cell or one set of assets), a start and end date, the signal you will watch, the number the plant will use to call it a success, and the price. Charging for a pilot, even a small amount, filters out plants that were never going to buy. Our page on pricing a paid pilot covers how, and free pilots die of no end date explains why the end date matters.

Then work out the sentence a plant leader will want to repeat upstairs: "For six weeks we watched the gearbox on Line 3, and here is what the vibration data told us about the next shutdown." If your pilot cannot produce a sentence like that, change the pilot before you write to anyone.

Three buyers inside a plant, three different first lines

BuyerWhat they ownLead withTheir likely objection
Maintenance or reliability managerDowntime on specific assets, the work order backlogThe asset you will watch and the failure you can see earlierAnother system to look at all day
Plant or operations managerOutput, safety record, the plant budgetThe pilot scope, time on site and what it costsDisruption to production
IT or OT security leadThe plant network and what connects to itHow data leaves the sensor, where it goes and who can see itAnything that opens a path to the control network

Write first to the maintenance or reliability manager, because that person feels the pain most directly. Bring in the plant manager for the budget and the OT security lead early, since a pilot can stall for weeks on a network review. The ISA/IEC 62443 series, published by ISA and adopted by the IEC, sets security requirements for industrial automation and control systems, with parts written for asset owners, product suppliers, integrators and service suppliers. Ask your plant contact whether the plant follows it, and have a short document ready that says how your device and data path fit. A one page answer helps, and our guide to passing a customer security questionnaire shows the layout. To find the plant leader by name, read how to find the plant manager of a factory.

Choosing the first fifty plants

Build a list where your pilot fits without custom work. A practical filter has four parts:

  1. Asset type: plants that run the machines you already monitor, such as pumps, motors, compressors, presses or conveyors.
  2. Size: sites with enough maintenance staff to look at your data, and a budget that does not need corporate approval for a small pilot.
  3. Location: sites within a drive of your field engineer, since the first installs need someone on site.
  4. Signal: a plant that is hiring a reliability engineer or maintenance planner, expanding a line or posting about unplanned downtime. These are public posts and job ads you can read, and they tell you where a pilot would be welcome.

Fifty plants beats five hundred. The first fifty let you hold real conversations, and what they say about the objections will change the list for the next fifty.

A four week outbound plan

WeekWorkOutput
1Write the one page pilot offer and the security note. Build the first fifty names with maintenance and plant leadersOffer, note and list
2Send the first emails to the maintenance or reliability managers in batches of tenReplies to read, objections to log
3One follow up per person with a short question about the asset. Offer a callFirst calls booked
4Review what each reply said. Change the offer or the list before sending moreA second, better list

Writing to maintenance about one line

Subject: A six week sensor pilot for the new Oakhallow molding line

Hi Reggie, I saw that Oakhallow Plastics is adding a molding line in its Ohio plant. We make wireless sensors and software that track vibration and temperature on motors and gearboxes, and we are looking for one plant to run a six week paid pilot on a single line. I can send a one page offer that shows what we would install, what you would see and what we would both agree to measure. Who in maintenance would look at something like that?

Mattias
Gaugewright Systems, [street address, city, state, ZIP]

If you would rather not get emails from me, reply "stop" and I will not write again.

The email asks one question and promises nothing about the result, because a pilot's result is not known in advance. If a past customer agrees to be named, add one factual sentence about the install, and leave the line out if not.

After a yes, and after a pilot

Move fast on a "yes, tell me more": send the one page offer, propose two times with the time zone, and ask who else at the plant would join the call. After the pilot, write the result together with the plant contact before anyone leaves the building, and ask who would need to approve a wider install. Work from the opposite direction as well: when a plant says no to a pilot, ask whether a sister plant belongs to the same company. A comparable page for vehicles is outbound for fleet telematics companies, and the hardware startup story a hardware startup sells the pilot before the production run covers the same sequence from the founder's side.

Fifty plants means a week of emails and a stack of replies, which is work for Emma more than for your field engineer. In Rocketship you name the plants and the roles. She finds the people, reads each plant's website and emails from your own Gmail, then follows up, answers and books. Use the 7-day free trial on every monthly plan, card required, for the first fifty, and see plans on the pricing page.