A commercial contractor with an estimator who also does the selling has a pipeline problem that is really a calendar problem: bids are due Thursday, so the week's calls never happen. The fix is a small, fixed routine of four or five hours a week, a bid log that shows where each job stands, and a rule that outreach happens on set mornings no matter what is due.
Week 1: name the three buyers you want more of
Before any outreach, write down your last 20 jobs with the buyer type and the award size. Many commercial contractors find that two or three buyer types produced most of the margin. For one example firm, a mechanical contractor, it might be property managers of office buildings, general contractors building medical offices and school districts. Pick those three and drop the rest from this plan.
Then set a target in jobs, not dollars: "four new bid invitations a month from buyers we have never bid for." A target in invitations is within your control; an award is not. The page on getting clients as a general contractor shows the same logic from the GC side.
Week 2: build a list of 60 and a bid log
Sixty named people is enough for three months: 20 per buyer type. For each, record the company, the person's title, the source of the name and one fact. Sources that work for commercial buyers include permit filings for projects in your trade, published bid lists from owners, GC project pages and the board agendas of school districts and municipalities.
Keep a bid log in a spreadsheet with these columns:
- Project and buyer
- Date invited and date bid due
- Amount bid
- Status: invited, bid in, shortlisted, awarded, lost
- Reason if lost, in the buyer's words when you can get them
- Next contact date
The "next contact date" column does the most work. Every row without a date is a lead that will go quiet. The sequence in follow-up after a bid submission gives the wording for the dated touches.
Week 3: write the one message you will send
A contractor's first note to a new buyer should be short and specific to the trade. Do not list your services. State the kind of work you did recently, in terms a buyer can compare, and ask whether they take bids from new subcontractors on projects like it. Use your real numbers only when you have them; leave out the claim otherwise.
Subject: Mechanical bids for the Garnet Lane medical building
Hello,
I am the estimator at Corbel Mechanical. We install and service HVAC in commercial buildings, and recent work includes two outpatient medical offices. I saw the Garnet Lane medical building listed in the county permit records.
Could you tell me who handles mechanical bid invitations, and whether you take bids from firms you have not used before?
Ruth Alvarado
Corbel Mechanical, [street address, city, state, ZIP]
If you would rather not get emails from me, reply "stop" and I will remove you.
Send six of these on two set mornings a week, Tuesday and Thursday before the first call of the day. That is twelve a week, first notes and follow-ups together, and about half an hour of writing once the list is ready. Replies go to a tracker, not your head. If your quote is out and quiet, see how to follow up on a quote.
Week 4: the Friday review
Every Friday, 30 minutes with the bid log. Answer four questions and write the answers on the sheet.
- How many new invitations came in this week, and from whom?
- Which bids are due next week, and what is the next contact on each one already out?
- Which lost bids need a call to ask what decided it? Ask once, politely, and write down the answer.
- Who on the list of 60 has not had a message in 30 days?
This is the whole pipeline process. It looks small because it is small; its value is that it happens in a week when bids are due.
The hours, honestly
| Task | Hours a week (example) |
|---|---|
| Writing and sending 12 notes | 0.5 |
| Replying to answers, scheduling calls | 1 |
| Calls and site walks with new buyers | 2 |
| Friday review and list upkeep | 1 |
These hours are an example, not a measured figure. If your estimator's week is already over capacity, the first thing to give up is list upkeep, not the Friday review. The longer reasoning on running this without a hire is in outbound with no sales team.
When a bid is lost
A lost bid is the cheapest market research a contractor gets. Within a week, send the buyer one line: thank them, ask whether price, schedule or scope decided it, and say you would like to bid the next one. Many will answer in a sentence. Write the answer in the log. After ten lost bids the pattern is usually plain: you are high on one trade package, or late on one type of drawing, or not on the list at all. Fix that one thing before you add more outreach, because more invitations on a package you cannot win only lengthens the list of losses.
The slow parts of this plan are the list and the first notes, and those can leave your estimator's desk. Rocketship finds project managers and owners by name, sends from your own Gmail, follows up and answers replies, and books meetings onto your calendar once it is connected, so the Friday review is about answers rather than writing. Start with the 7-day free trial on every monthly plan, card required, and see the pricing.