To plan sales capacity, divide your new-revenue target by what a ramped rep actually closes (quota times expected attainment), then count each hire at a ramped fraction of a rep for the months left in the year, which shows how many reps you need and how early you must hire them.

All figures below are made-up examples to show the arithmetic. Replace them with your own.

The inputs

InputExampleWhere it comes from
---------
New-business revenue target for the year$6.0MThe board plan
Quota per fully ramped rep$900,000Your comp plan
Average attainment of ramped reps70%Your last four quarters
Productive capacity per ramped rep$630,000Quota x attainment
RampMonths 1 to 3: 0%. Months 4 to 6: 50%. Month 7 on: 100%Time to first close in your history
Current ramped reps5Roster
Expected attrition1 rep leaves at mid-yearLast two years

Use attainment, not quota. A plan built on quota alone assumes every ramped rep hits it, and your own last four quarters will show whether they do.

Step 1: what the current team delivers

Five ramped reps at $630,000 each is $3.15M. If one leaves at mid-year and is not replaced, that rep contributes half a year: $315,000. So four full reps ($2.52M) plus one half ($0.315M) gives $2.835M. The gap to the $6.0M target is about $3.17M.

Step 2: what a new hire is worth this year

A rep hired on January 1 produces nothing in months 1 to 3, half capacity in months 4 to 6, and full capacity in months 7 to 12. In rep-months: 0 + 1.5 + 6 = 7.5 of 12, so 62.5% of a ramped rep. 62.5% of $630,000 is $393,750.

A rep hired on April 1: months 4 to 6 of their tenure are July to September, which is 1.5, and months 7 to 9 are October to December, which is 3. Total 4.5 of 12, or 37.5%: $236,250.

A rep hired on July 1 contributes only the first half of their ramp this year: zero output for three months, then 1.5 rep-months, which is 12.5%, or $78,750.

Hire dateShare of a ramped rep this yearRevenue this year
---------
January 162.5%$393,750
April 137.5%$236,250
July 112.5%$78,750
October 10%$0

Step 3: the answer and what it tells you

The gap is $3.17M. Even if every hire starts on January 1, you need about 8 reps to close it ($3.17M / $393,750 = 8.05). That is a team of 13 on paper at the start of the year, with one of them leaving. If hires are spread across the year, the number rises. The honest conclusion for most growth plans is one of three: the target is too high for the headcount budget, the ramp is too long, or capacity has to come from somewhere other than new reps.

Run the sheet again with the real dates of your hiring plan. Pay attention to the months, not the count: a hire in October is capacity for next year, and a plan that counts it as this year's is wrong.

The levers, in order of how fast they work

  1. Raise attainment. Coaching and a better lead flow move the existing five reps at once.
  2. Shorten ramp. A tighter onboarding plan, sandbox accounts and warm lists get a new rep to first close sooner. Each month cut is worth more than it looks: in the example, cutting three months of zero output raises a January hire from 62.5% to 87.5%.
  3. Add pipeline coverage. A rep who closes 25% of qualified opportunities needs four times quota in pipeline. If pipeline is short, hiring more closers does not help; more qualified meetings do. Compare AI cost per meeting versus a human.
  4. Hire. The slowest and the most expensive.

Meetings capacity needed

Work backward from revenue to meetings. At an average deal of $60,000, $3.17M is 53 deals. At a 25% win rate from qualified opportunity, that is 212 opportunities. If one in two first meetings becomes a qualified opportunity, 424 first meetings, or about 35 a month. That is the number an SDR team, an agency or software has to produce, and it tells you what to budget; see sales capacity planning for a startup for the smaller version and how to set a quota for your first sales rep for quota design.

What to put in the board deck

Boards prefer one table over a narrative. Show the target, the capacity of the current team after expected attrition, the gap, the capacity added by each planned hire given its start date, and what is left uncovered. Add a second table with the same math at 60% attainment and at 80%, so the board sees the range, not a point. If the plan depends on hires starting in the first quarter, say what happens to the target if recruiting takes an extra two months. A plan that shows its sensitivity gets fewer arguments than a plan that shows a single number.

Review the sheet every month with three actuals: attainment of ramped reps so far this year, how many months new reps took to first close, and how many reps have left. Replace the example inputs with these as soon as you have two quarters of data.

If the meetings number is the gap in your sheet, Rocketship is one way to add first meetings without adding headcount. It finds buyers by name, emails from your reps' own Gmail accounts, follows up and answers replies, and it books on connected calendars. Add its cost from the pricing page to the same table, and measure a week of first meetings with the 7-day free trial on every monthly plan, card required, before you put it in the board deck.