Commercial concrete work comes from general contractors, so getting contracts means getting on their bid lists, passing their prequalification and sending a priced proposal on the scope they ask for, on time, every time. A crew that does that with a clean safety record and a clear bonding capacity becomes the first call on the next project.

Who hands out commercial concrete work

Commercial concrete is bought by general contractors and construction managers, and sometimes directly by developers or owners on design-build projects. They send invitations to bid to a list of subcontractors in each trade. Your goal is to be on that list before the next project starts, and to be a name the estimator remembers when the list is cut short. For a process of finding them, how to find general contractors to sell to and how to sell to general contractors cover the buyer in detail.

Look at what is being built in your area: building permits list project type, valuation and the general contractor in many jurisdictions, and many cities publish them online. Public bid notices for government and school projects list scope, plan holders and bid date. A project worth a few million dollars with a foundation and slab-on-grade package is a fair target for a crew with a pump truck and a finishing team.

Prequalification paperwork

Most larger general contractors ask subcontractors to prequalify before they receive bid invitations. The package varies, but the common requests are predictable. Put the documents in one folder you can send the same day.

DocumentWhat they check
Insurance certificateGeneral liability, workers compensation, auto and umbrella limits; additional insured endorsements
Safety recordOSHA recordable rates, your experience modification rate (EMR), which NCCI or your state's rating bureau calculates and your insurance agent can pull, a written safety program
Bonding letterSingle-project and aggregate capacity from your surety
Financial statementOften reviewed by the surety or the GC's finance team
Project list with referencesSimilar scope and size, owner contact, completion date
Licenses and registrationsState contractor license where required, local registrations
Silica exposure planSee below

The silica question is real

Cutting, grinding or drilling concrete creates respirable crystalline silica dust. OSHA's construction standard, 29 CFR 1926.1153, requires employers to limit exposure and to have a written exposure control plan; its Table 1 lists specified controls for common tasks such as handheld saws, which an employer can follow instead of measuring exposure. A general contractor's safety manager will ask to see your plan, so write it before a bid, not after you win. Table 1 does not remove the written plan requirement. Your own state may have an OSHA-approved state plan with its own rules, so check which applies.

Pricing a commercial pour

Commercial bids are built from quantities, not from a square-foot guess. An estimator takes off the concrete volume in cubic yards from the plans, then adds forming, rebar placement, finishing labor, pumping, curing, sawcutting and cleanup, plus supervision and overhead and a margin. Concrete supply price changes with the plant and the haul; get written quotes from your suppliers for the bid and note how long they hold. State plainly what you exclude: testing and inspection (usually the owner's), subgrade preparation if another trade does it, and dewatering. A bid with clear inclusions and exclusions loses less money in change orders than a low bid with gaps. The same discipline applies in how to get customers for a concrete contractor, which covers residential and light commercial work.

Staying on the list

Estimators remember subs who make their job easier. They compare five or six numbers on the same afternoon, usually against a deadline, and they want a proposal that is clear about scope and honest about exclusions.

  • Answer every invitation, even with a decline, so the estimator knows you read it. A one-line "no bid, full schedule" keeps you on the list.
  • Bid on time with a proposal that matches their format, with the addenda acknowledged.
  • Ask after each bid how you ranked. Estimators will often tell you the gap.
  • Send a short capacity update each quarter: crews free, equipment, months available.

A first email to a general contractor's estimator

Subject: Concrete sub for your Q1 projects

Hi Marguerite,

Ashbourne Concrete does foundations, slabs and tilt-up panels for commercial projects up to about 80,000 square feet, with our own forming crews and a pump. I would like to be on your invitation list for concrete packages.

I can send our prequalification folder (insurance, safety program, bonding letter, project list) today. Is there a portal you prefer?

Hector Veldt, Ashbourne Concrete
[street address, city, state, ZIP]

Not for you? Reply "stop" and I will not write again.

Names, sizes and capacities are invented, and a real email should state only what you can document. For your first projects as a sub, how to get drywall contracts as a subcontractor shows the same bid-list path for another trade, and follow up email after bid submission covers what to send once a number is in. Ask the estimator for the bid-day debrief; many will tell you where you landed, and that single answer teaches you more about your pricing than a year of guessing.

Estimators and project managers are named on bid notices, permits and company sites, and Rocketship can do the finding and the follow-up: Emma finds them by name, emails them from your own Gmail, follows up and books the calls. The pricing page has the plans; there is a 7-day free trial on every monthly plan, card required.