An EV charging network operator buys for many sites at once and is judged on whether the chargers work. A vendor of hardware, installation, maintenance or software therefore sells against four things: the standards the operator has to build to, uptime per charging port, the cost per site across a rollout and the speed of getting a site from agreement to energized. Learn the standards, translate your product into uptime and cost per site, and propose a pilot on a handful of sites with a measure the operator already tracks.

Who buys at a network operator

RoleWhat they decideWhat to bring
VP or director of site developmentWhich sites get built and by whomA schedule from agreement to energized, and the permits and utility steps you handle
Head of operations or network operationsHow the network is monitored and repairedResponse times, parts plans and port-level reporting
Hardware or product leadWhich chargers are specifiedCertifications, connector and power ratings, and warranty terms
Software or technology leadWhich network software and protocols are usedIntegration details and data access
Procurement and financeUnit costs, contract terms, funding rulesA price per site and per port, with exclusions listed
Site host relationsRetailers, hotels and property owners who host chargersSimple terms the host can sign

Our page on getting commercial EV charger installation clients covers installers selling to site owners; this page covers vendors selling to the operator that runs many sites.

The federal standards operators build to

The federal National Electric Vehicle Infrastructure (NEVI) minimum standards in 23 CFR Part 680 apply to stations funded through that program, and they are a useful reference for any operator you meet. Four requirements matter for a vendor:

  • Ports: a station needs at least four network-connected charging ports (23 CFR 680.106).
  • Power and connectors: direct current fast charging ports on designated corridors must have a continuous power rating of at least 150 kilowatts, and each such port must support any charging-standard-compliant vehicle with a permanently attached CCS Type 1 connector. Alternating current Level 2 ports need at least 6 kilowatts and a permanently attached J1772 connector.
  • Uptime: for funded stations, each charging port must have an average annual uptime of greater than 97 percent (23 CFR 680.116(b)). A port counts as up when its hardware and software are online and available or in use and it dispenses electricity at the required minimum power. The calculation runs monthly over the previous twelve months using the 525,600 minutes in a year minus outage minutes, and excludes outages outside the operator's control, such as utility interruptions, scheduled maintenance, vandalism and natural disasters, if the operator can show the port would otherwise have worked.
  • Pricing and data: prices must be shown before a session starts, in dollars per kilowatt-hour, with any extra fees clearly displayed, and certain data fields are made available to third-party developers through an application programming interface (23 CFR 680.116).

The program's funding rules and guidance have changed over time, so check the Federal Highway Administration's current guidance for any project you pitch, and ask each operator which standards govern their sites. The regulation text above is what to read first.

Turn the uptime standard into your offer

An uptime figure above 97 percent sounds high until you count the minutes. Three percent of 525,600 minutes is 15,768 minutes a year, which is about 263 hours, or 11 days, in which a port can be down before the average falls to 97 percent. Here is how a maintenance vendor could use that in an invented example.

  1. A network has 40 sites with 4 ports each: 160 ports. Each port may be down for about 263 hours a year in the average, outages outside the operator's control excluded.
  2. If a typical repair visit takes the port out of service for 48 hours from fault to fix, a port can afford about five such visits a year, before counting any other downtime.
  3. Your offer is to cut the hours from fault to fix: remote diagnosis, a parts depot near the sites and response times written into the contract.
  4. Show the operator a table of response time by port, and what each hour of downtime is worth in lost sessions at the operator's own price per kilowatt-hour and typical session.

The figures are made up; the form is the point. Ask the operator for its own fault-to-fix average and its worst sites. Our page on selling to electric, water and gas utilities covers the other party every site depends on, because the utility interconnection often decides the schedule.

What hardware, installation and software vendors open with

  • Hardware: certifications, connector and power ratings, warranty terms and a track record of port-level uptime from a deployed fleet that you can document.
  • Installation: time from site agreement to energized, permit and utility steps you handle, and a fixed price per site range with the assumptions listed.
  • Maintenance and field service: response time, remote diagnosis, parts availability and reporting by port.
  • Network software: how it reports uptime the way the standard defines it, how it handles payment and price display and what its data interfaces are.
  • Utility and interconnection consulting: how many weeks you take out of the path from application to energization.

A pilot of a few sites

  1. Offer three to ten sites in one metro, with a start date and a review date.
  2. Agree the measure first: time from agreement to energized, fault-to-fix hours or port uptime by the standard's definition.
  3. Name the person at the operator who will see the numbers weekly.
  4. Write the price for the next fifty sites before the pilot starts, so the review is a decision and not a negotiation.

Writing to network operations about fault-to-fix hours

Subject: Fault-to-fix hours per port, tested on five sites

Hi Imran, a charging port at a station funded under the federal NEVI program has to average more than 97 percent uptime, which leaves about 263 hours a year of downtime per port before the average falls. Ironbell Charger Service provides field service and remote diagnosis for charging networks, and the number we work on is the hours from fault to fix. If it would help, I can send a one-page template for reporting that by port and a proposal for a pilot on five of your sites. Who owns maintenance contracts on your side?

Soraya
Ironbell Charger Service, [street address, city, state, ZIP]

If you would rather not get emails from me, reply "stop" and I will remove you.

The email uses a number from the standard, offers a template and a pilot and asks who owns maintenance contracts. It claims no uptime result. If the operator is not building to the NEVI standard, drop the first sentence and ask what the operator's own uptime target is.

Where to find the operators

Networks and the businesses that run chargers for retailers, hotels and fleets publish their site counts and leadership on their own pages and in the announcements of new locations. Build a list by size and region, name the operations lead and the development lead at each, and write to ten a week. Our page on getting commercial energy clients as a broker shows how an adjacent field finds its buyers.

Two leaders at each of fifty operators, with a real email to each, is the research that has to come first. Rocketship handles that research and the first note: Emma finds the operations and development leads at each network, reads the operator's website, emails from your Gmail and books the calls. Try one group of operators on a 7-day free trial on every monthly plan, card required; the pricing page lists plans.