A utility scale solar developer buys in stages, and the right buyer for you depends on the stage. Early in development they want studies and site services. After financing they want equipment and construction, and the engineering, procurement and construction (EPC) firm they hire often does the buying. Your timing follows the project's schedule, which is set by interconnection, so the first questions to ask a developer are where a project stands in the queue and which package of work is open.
The stages, who buys and what you sell
| Stage | Who decides | What is bought |
|---|---|---|
| Site control and early development | Developer's development team | Land and environmental studies, surveys, geotechnical work, permitting support |
| Interconnection and design | Development and engineering leads, owner's engineer | Engineering studies, design services, grid analysis |
| Financing and procurement planning | Developer's procurement and finance teams, lenders' independent engineer | Equipment under supply agreements, technical review, insurance |
| Construction | EPC contractor's procurement and project managers | Materials, labor, subcontracts, testing, inspection |
| Operations | Asset manager and the O&M provider | Monitoring, maintenance, spare parts |
Some developers hire an EPC contractor and let it buy most of the equipment, and others buy major items themselves and assign them to the EPC. Ask which model a project uses before you decide whom to call. In either case, you may need to be approved by two parties: the one that pays and the one that builds.
Interconnection sets the calendar
A project cannot sell power until it connects to the grid, so the interconnection process often decides when the rest happens. In 2023 the Federal Energy Regulatory Commission adopted reforms to its standard generator interconnection procedures and agreements, issued as Order No. 2023 and published in the Federal Register on September 6, 2023 (88 FR 61014), to address queue backlogs, improve certainty and prevent undue discrimination against new technologies. For a vendor, the practical lesson is to ask each developer where a project is in its study process and what the expected in-service date is. A project that has completed its studies and signed its interconnection agreement is closer to buying. A project at the start of the queue is not, however large it looks. The Energy Information Administration's monthly generator inventory, which tracks existing and proposed generating units at plants of 1 megawatt or more, is a public place to see proposed projects, and the developer's own website and the state siting or utility commission records show more.
Supply chain proof is part of the sale
If you sell equipment or materials that are imported or contain imported parts, expect questions about origin. U.S. Customs and Border Protection enforces a rebuttable presumption, in effect since June 21, 2022 under the Uyghur Forced Labor Prevention Act, that goods mined, produced or manufactured wholly or in part in the Xinjiang Uyghur Autonomous Region, or by entities on the UFLPA Entity List, are barred from U.S. entry, and an importer must overcome the presumption by clear and convincing evidence. CBP also says it is incumbent on importers to apply due diligence and effective supply chain tracing. A developer or an EPC that imports components needs documents from you that show where your products and their inputs come from. Prepare a supply chain file before the first meeting: manufacturing sites, key suppliers by tier and the audit trail you hold. If you cannot trace an input, say so and say what you are doing about it.
How to approach a developer
- Map the portfolio. List a developer's projects by stage: in development, in queue, financed, in construction, operating.
- Offer something for the stage. Studies for early projects, supply and pricing for financed ones, services for projects in construction.
- Ask for the package, not the project. "Is the pile testing package open on the project in the county north of Lubbock?" gets a better answer than "Are you buying anything?"
- Get on the bidder list for the EPC too. The EPC often runs its own list for subcontracts.
- Bring references from similar projects, and say which ones you may name.
Pile load testing for the next construction start
Subject: Pile load testing for the projects on your Texas schedule
Hi Marisa, I read on your company's project page that two of your Texas solar projects are expected to start construction next year. Halsdorf Geotechnical runs pile load testing and geotechnical investigations for utility scale solar sites, and we have supply chain documents for the equipment we use.
If the testing package for either project is still open, I can send our scope, a typical schedule and the personnel certifications our crews hold. This is an introduction, and I am not asking for a commitment on any specific project.
Hendrick
Halsdorf Geotechnical, [street address, city, state, ZIP]
If you would rather not get emails from me, reply "stop" and I will remove you.
If your product is equipment, replace the first sentence with one about the stage that the developer says the project is in. How to sell to real estate developers covers the neighboring buyer, how to sell to solar installers covers the smaller side of the solar trade, and how to sell to electric, water and gas utilities covers the utility side of interconnection. Selling to electric cooperatives is the other large buyer of generation and grid equipment.
Developers and EPC firms that match your product, and the procurement or development lead at each, can be found and written to by Rocketship. Emma reads each company's website first, sends from your own Gmail, follows up and answers replies, then books the call on your calendar. Map one developer's portfolio, then hand the contacts over during the 7-day free trial on every monthly plan, card required; Starter costs $12 a month and Frontier $79 for a team.