A construction management firm should run outbound to owners and developers before the project is bid, using public signals such as passed bond measures, approved site plans and capital plans, and offer a short preconstruction review that shows how the firm would manage cost and schedule on that project.
Why timing decides this sale
Owners pick a construction manager early, often while the design is still being drawn. By the time a general contractor is invited to bid, the CM has usually been chosen or the owner has decided to go without one. Outbound for a CM firm is therefore a matter of reaching the owner while the project is a plan, and giving them a reason to talk to you before the selection process fixes the shortlist.
The signals that a project is coming
| Signal | Where | Who the owner is |
|---|---|---|
| --- | --- | --- |
| A school bond measure passed | Election results, district announcements | School district facilities and business leaders |
| A site plan or rezoning filed | Planning commission agendas | Developer principal, land acquisition lead |
| A capital improvement plan adopted | City or county budget documents | Public works director, city manager |
| A hospital or university master plan | Board packets, press releases | Facilities and capital projects directors |
| A financing announced for a new facility | Press, filings | CFO, development lead |
| A property sale of a large parcel | Public records | New owner's real estate lead |
For public owners, selection often follows a qualifications-based process. The federal Brooks Act (40 U.S.C. 1101 and following) is the model for architects and engineers, and states set their own rules for construction management services, including whether construction manager at risk is permitted on public work. Check the rule in your state before you pursue a public owner, since it decides whether you compete on qualifications, on price or on both.
The people on the owner side
- Owner's representative or director of capital projects at institutions.
- The development principal and the head of construction at a private developer.
- The business official or facilities director at school districts.
- The CFO at a company building its own facility.
- The architect on the project, who often recommends CMs, so a note to the architect belongs in the plan.
The offer: a preconstruction review
Give owners something they can accept without committing to a contract. A short review of the project's budget, schedule and risks from the information they have: a one or two page note covering a rough cost range with its assumptions, the three schedule risks you see, and the long-lead items to order early. Offer it as a meeting: "I would like 30 minutes to share what I see in the site plan, and I will leave you with a one page note." Only claim experience you have, and do not state a budget figure as fact before you have seen the drawings.
A message that cites a public agenda
Subject: the Eastgate library renovation and the long-lead items
Dear Ms. Whitcombe,
I read that the Eastgate library project is on the commission's agenda for design approval. We manage renovations of public buildings from design through occupancy, and the long-lead items on a library, such as mechanical equipment and curtain wall, often decide the schedule.
May I send you a one page preconstruction note on the project, and share a similar library we managed? I can call after the commission meets.
Thank you,
Rafael Kessling
Alderbrook Construction Management, [street address, city, state, ZIP]
If you would rather not hear from me, reply "stop" and I will not write again.
A six week plan
Week 1: pick one owner type and one region; list 40 owners with a visible signal. Week 2: write to 20 of them, and to the architects on the same projects. Week 3: follow up with the one page note for those who replied or stayed silent. Week 4: call anyone who opened the note or answered. Week 5: send a second wave of 20. Week 6: review the replies and keep a short list of qualified conversations with the owner's next decision date.
What to track for a CM pursuit
Meetings with the owner's decision maker, qualification requests received, interviews won and the time between first contact and invitation. Fees on a CM project can run in the hundreds of thousands, so one interview a quarter justifies the effort. Keep a record of the date each owner expects to select a CM and write to them before it.
See how to sell to construction project executives for the contractor-side buyer, how to sell to construction companies for vendors, and how to get clients as an architect for the neighboring discipline.
Interviews: what the owner is really deciding
When a construction manager is shortlisted, the interview is about people, not brochures. Owners pick the project manager and the superintendent they will see every week. Bring those two names to the interview, with what each has built and what they do when a bid package comes in over budget. Prepare three stories in the same shape: the situation, what you saw, what you did and what the owner decided. If a story has a result you can state, state it; if it does not, tell the story of the process.
Fee structure matters. Owners compare a fee for services with a percentage of construction cost, a fixed fee, a guaranteed maximum price and the general conditions budget. State your structure plainly and the assumptions behind it. A CM firm that explains its own pricing in one page earns trust that a vague proposal does not.
Letters of reference and the owner's other advisors
Owners ask other owners. Keep a list of three or four clients who will take a call, with the contact, the project and the year, and ask each for permission before you send the list. Architects, lenders and attorneys also recommend CMs, so write to them quarterly with a short note about projects you have delivered; they are often the people an owner calls first.
Owners decide early, so the notes have to go out while the project is still on an agenda. Rocketship finds owners and facilities leaders by name, writes from your own Gmail, follows up and answers replies. Connect a calendar and it books the meeting. The pricing page lists the plans, and week one of the six week plan can run on the 7-day free trial on every monthly plan, card required.