An architecture firm without a business development person builds a pipeline by assigning each principal a small set of project types, watching the public records that show those projects before an architect is chosen, and keeping a regular contact list of past clients, contractors and developers who send the next job.

Why architecture work arrives late and what to do about it

By the time a project is publicly bid, the architect is often chosen. The firms that win have usually been in the owner's mind for months. So the pipeline has two jobs: reach owners before the selection, and stay in front of the people who recommend architects.

Signals that precede a project

Local governments publish what is coming. Planning commission and zoning board agendas list rezoning requests, site plan reviews and variances, often with the applicant's name and the proposed use. School board packets list facility plans and bond projects. Hospital and university capital plans are posted. Building permit data, where public, shows who pulled a permit for a shell that has no tenant improvement yet. Commercial brokers announce lease signings.

For federal work, architect selection follows the qualifications-based process in the Brooks Act (40 U.S.C. 1101 and following), where firms are ranked on qualifications and a price is negotiated with the top-ranked firm. Many states have similar laws for public projects, and the details differ, so read your state's rule before you pursue public work.

Project typeWhere the signal appearsWho to write to
---------
MultifamilyPlanning agendas, land salesDeveloper principal, land acquisition lead
SchoolsBoard packets, bond measuresFacilities director, assistant superintendent
Medical officesLease announcements, certificates of need where usedPractice administrator, real estate lead
Retail and restaurantsLease signings, permit applicationsOwner, franchise development lead
Warehouse and light manufacturingSite plans, economic development announcementsDeveloper, construction manager

A principal's four hours

Each principal reserves four hours a week, in a block, and the firm does not bill them against client work. Suggested split: one hour reading the agendas and permit lists for their project types, one hour writing to the three most promising owners or developers, one hour with past clients and referral partners, and one hour on follow-up and the log. The agenda reading is the engine: it produces the names you write to.

Past clients and referral sources

Pull a list of everyone you have worked for in the last seven years. The owner who built a clinic with you may be opening a second site. The contractor who built your project hears about new work before it is announced. The lender, the real estate broker and the civil engineer each know owners who need an architect. Ask each for one introduction at a time and say what kind: "owners of medical office buildings of 10,000 to 30,000 square feet". See how to ask for referrals and referral partners.

A first note to a developer

Subject: the Cedar Fork mixed-use site plan

Dear Mr. Pruitt,

The planning commission agenda for the 12th lists Cedar Fork Development's site plan for the Elm Street parcel. Our firm has designed four mixed-use buildings of similar scale in the county, and we know the planning staff's review process for that district.

If it would help before you choose a design team, I can send a short qualifications package and a one-page note on how the site plan review usually unfolds. Would that be useful?

Evander Hollinbrook
Hollinbrook Architects, [street address, city, state, ZIP]

If you would rather not hear from me, reply "stop" and I will not write again.

The email cites a public item, gives a reason to trust you and offers something useful, not a request for the job. The reason to trust you has to be true: name only projects your firm actually designed.

Qualifications packages that answer fast

Keep a current qualifications package for each project type: three comparable projects, team bios, a one-page approach, and references. When a request arrives you can respond in a day. Public agencies publish requests for qualifications with fixed deadlines; for those, see how to respond to an RFP as a small firm.

The log

One sheet: name, organization, project type, signal and date, source of the signal, last contact, next step with date, and fee estimate. Review it weekly. For stages see sales pipeline stages, and for the buyer's side how to get clients as an architect covers the single-practice version.

What a first year looks like

Months one to two: pick two project types and write the qualifications package for each. Months two to four: read the agendas weekly, send two to three notes a week, and ask every past client for one introduction. Months four to eight: expect conversations, a few qualification requests and the occasional interview, and keep the log honest about which signal produced each one. Months eight to twelve: look at the log and drop the signal sources that gave nothing. A firm that does this for a year usually learns which one project type it can win from a standing start. Architecture sales cycles are long, so judge the first six months by conversations held and invitations to submit qualifications, not by signed fees.

What to leave out of a note to a developer

Do not send a portfolio PDF to every developer in the county. Owners do not read generic brochures, and large attachments sent cold risk the spam folder. Do not criticize a design you saw. Do not offer free design work. If an owner asks for a "quick sketch to see the idea", say that you would be glad to give a fee proposal for a feasibility study instead; a firm that gives away its first drawings teaches owners that drawings are free.

Client work always wins the afternoon, and the agenda reading and notes get dropped. Rocketship can carry that load: it finds developers and facilities directors by name, writes from the firm's Gmail, follows up and answers replies, and books a call on a principal's calendar once it is connected. Plans are on the pricing page. A principal can try it on one project type with the 7-day free trial on every monthly plan, card required.