In many contracting businesses the owner is also the estimator. The owner reads the drawings, walks the site, prices the work and writes the proposal, and the crews wait on the answer. That job leaves no time to find new work, so the pipeline dries up whenever the bid list is full. The owner does not need a sales department to fix this. The owner needs a bid rule that stops low-odds bids from taking the week, a fixed block of time for prospecting that is not moved, and a plan to hand part of the estimating to someone else. Each of the three is worked through below, with an example and the measures that show whether the pipeline is growing.
Why the owner's calendar is the real constraint
An owner who estimates every bid spends most of the week in quantities, subcontractor quotes and the scope. Prospecting is the first thing dropped, because it has no deadline. A bid has a due date and a client waiting for the number. A prospect who might call next quarter does not. The result is a business that is busy with the bids it has and has no pipeline for the bids it will need in six months.
The fix is to treat prospecting as a standing appointment, the same way the owner treats a bid due date. Put it on the calendar every week, and treat a cancellation as a missed bid.
Map the week before you change it
Track the owner's hours for two weeks before making any change. Note each block of time by activity: estimating, site visits, subcontractor calls, crew issues, office work and everything else. Owners are often surprised by the total for estimating, and by how much of it goes to bids they will never win.
| Activity | What to record | What to decide |
|---|---|---|
| Estimating | Hours per bid, and whether the bid was won | Which bids get the owner's hours and which get a quicker answer |
| Site visits | Visits to bids that never reached a contract | Whether a visit requires a bid invitation first |
| Prospecting | Hours spent, zero if the block was moved | The fixed weekly block and who protects it |
| Crew and office | Hours spent on problems a foreman could solve | What to hand to the foreman or office manager |
A bid rule that protects the week
A bid rule is a short list of questions the owner answers before any hours go into a proposal. Keep it to four or five questions, and write them where the office can see them. A typical set is whether the client has invited you, whether the scope matches the work you do, whether the schedule fits the crew, whether the general contractor has paid on time before, and whether the bid is one you could win with the price you can offer.
Any bid that fails two of the questions gets a reply, not an estimate. The reply can be a polite decline or a request for the scope in writing. An owner who keeps this rule should expect a fair share of bids to drop off the list, and the hours go to the bids that matter.
Cutting 40 bids to 26
Picture an invented contractor. A commercial painting and drywall contractor with 18 employees bids on 40 jobs a quarter. The owner spends an average of 6 hours on each bid, or 240 hours a quarter, and wins 8 of the 40, a 20 percent hit rate. Applying the bid rule removes 14 bids that failed two questions. The owner now bids 26 jobs, spending 156 hours, and wins 8 of them, which is a 31 percent hit rate, with 84 hours freed. The owner moves 4 hours a week, or about 50 hours a quarter, to a fixed prospecting block of two two-hour sessions, and spends the rest on the remaining bid work.
The arithmetic is the lever. The same number of wins comes from fewer bids, and the freed hours buy the next quarter's pipeline. The figures are invented and will differ by trade and by market, but the method is the same: count the hours, count the wins, and cut the bids that do not pay for their hours.
Hand part of the estimating to someone else
The owner does not need to hand off the whole estimate. Give a trusted estimator or a senior foreman the take-off for simple scopes, and keep the owner for the pricing, the subcontractor choices and the final review. Write the take-off checklist once, so the estimator can work from it without calling the owner for every item.
Start with the bids that repeat: the same general contractor, the same scope, the same schedule. A repeat bid is the easiest to hand off, and it frees the owner's hours for the new bids where the pricing needs judgment.
Build the prospecting block
- Choose two two-hour blocks a week and put them on the owner's calendar for a full quarter.
- Use the block for one task only: building the list of general contractors and developers in the trade's area, then reaching them.
- Move a bid, not the block, if a bid is due in that window. A bid that cannot wait is a bid to decline.
- Log every contact made in the block and the next date for each one.
- Review the list at the end of the quarter and remove the buyers who did not reply to two messages.
What to measure each quarter
- Bids sent, bids won, and the hit rate.
- Estimating hours per bid, and the hours freed by the bid rule.
- Prospecting hours spent, and the first meetings booked from them.
- Contracts signed from new general contractors, not repeat clients.
A contractor who tracks these four numbers will see the pipeline grow before the backlog shrinks. Keep the numbers on one page, and review them with the foreman each quarter.
For the general contractor as the buyer of trade work, see how to get clients as a general contractor. For a commercial trade that wins recurring work on a bid calendar, how to get commercial HVAC contracts covers the same kind of bid discipline. For the bids already out the door, estimate follow-up for contractors covers what to say.
Protect the prospecting block before the next bid comes in. Rocketship can carry part of that block for you: Emma finds the general contractors and developers you name, writes to each from your own Gmail during the weeks you are bidding, follows up and books the first meeting on your calendar, while the estimate and the bid decisions stay with the owner. Starter is $12 a month, the other plans are on the pricing page, and you can begin with a 7-day free trial on every monthly plan, card required.