A commissioning firm checks that a building's systems, mainly heating, cooling, ventilation, controls, lighting and electrical, are installed and perform as the owner intended, and its client is typically the owner, with design teams and contractors as strong referral sources. The best time to meet an owner is before design is finished, because commissioning works best when it starts early and the owner's requirements are written down first.

Who hires a commissioning firm

ClientWho decidesWhy they hire
Owner or developer of a large projectOwner's representative, director of capital projects, project executiveTo have an independent check that the systems meet the owner's requirements, and to reduce problems after occupancy
Hospital, university or school districtFacilities or capital projects director, sometimes a committeeComplex systems, long life of the building, and sometimes a requirement in the funding or program
Design teamPrincipal engineer or architectA commissioning agent as a partner on projects that require one, or on projects where the owner wants one
General contractorProject executive or project managerOccasionally to meet a contract requirement, which can lead to owner work
Existing building ownerFacilities manager, asset managerChecking and tuning systems in a building that already operates, often to find energy waste and comfort issues

Because the owner pays, the firm's independence matters, and an owner will ask who else you work for on the project. Be ready to say that you do not take work from the design team or contractor on the same project in a way that would compromise your review. For design-side referral work, see how to get MEP engineering clients and how to sell to engineering firm principals.

Why a project requires commissioning

Three kinds of trigger lead an owner to commissioning. First, a code: many jurisdictions adopt model energy codes that include commissioning requirements for commercial buildings, and the requirement, its thresholds and its exceptions depend on the code edition the jurisdiction has adopted. California is a concrete example. The California Energy Commission explains that under Section 120.8 of the 2022 Energy Code (Title 24, Part 6), newly built nonresidential space of 10,000 square feet or more needs the full process: owner's project requirements, basis of design, design review, a commissioning plan, functional performance testing, documentation and training, and a commissioning report, while smaller space needs the design review and the commissioning measures in the construction documents. For more than 50,000 square feet, or a complex mechanical system serving more than 10,000, the design review must be signed by a third-party engineer, architect or contractor, which is work an independent commissioning firm can sell. Healthcare facilities follow a separate chapter, and the state adopts a new edition every three years, so check which edition the permit falls under. Second, a rating system or program: green building programs such as LEED include commissioning among their requirements or credits, and public funders sometimes add their own. Third, the owner's own policy: an owner with a record of problems after opening, or one who will operate the building for decades, may require it on every project. For every project, ask which of these applies and read the actual requirement for that jurisdiction and program. A proposal should quote the adopted text, not a summary, and leave to the owner and its counsel which requirement applies.

Reach owners while the project is in design

Commissioning works best when the commissioning agent helps write the owner's project requirements and reviews the design, so the sales window is short and early. Look for:

  • Projects that have been funded or approved and are not yet bid: capital plans, bond measures, planning approvals.
  • A project that lists a green building certification as a goal.
  • An architect or engineer newly selected, which means design is beginning.
  • Owners who have just taken possession of a building with comfort or energy complaints, who are candidates for existing building work.

Write to the owner's representative or the capital projects director, and copy no one at first. For the school and public side, see how to sell to school district business officials, and for developers, how to sell to real estate developers. Our page on how to find the project manager on a construction project shows where project names appear.

The scope of a commissioning proposal

  1. The phases you cover: owner's requirements, design review, construction checks, functional testing, training review and a final report. Say which are included.
  2. The systems in scope, by name, and what is excluded.
  3. Who from your firm works on it, and their experience with similar buildings.
  4. The number of site visits and meetings you assume, and the price for more.
  5. What you need from the owner, the design team and the contractor, and when.
  6. The deliverables: a plan, issue logs, test procedures and a final report.
  7. A fee, with an invented example of its shape: a fixed fee for the phases, a stated hourly rate for out-of-scope work and a travel line.

Quote the owner's own scope of work where one exists. A written scope that separates your work from the design team's and the contractor's is the best protection against a dispute.

Existing buildings: a different sale

For an owner with a building that already operates, the pitch is about energy and comfort: a study that finds what is running when it should not be, what has drifted from its settings and what can be fixed cheaply. Offer a limited first study, a defined number of systems with a short report, and let the owner decide whether to continue. The page how to sell to energy and sustainability managers shows how that buyer reads an offer, and how to get building automation service contracts covers the service firms who often work alongside commissioning.

Writing to a school district's capital projects office

Subject: Commissioning scope for the Kestwyn Valley middle school project

Hi Stefan, Kestwyn Valley Schools approved a new middle school this spring, according to the board agenda, and I expect design is starting. We are a commissioning firm that works for school owners and starts with the owner's project requirements. I would like to send a one page example of how we scope commissioning on a school, and the questions we would ask before design is finished. Who is managing the project for the district?

Isolde
Larchwick Commissioning Partners, [street address, city, state, ZIP]

If you would rather not get emails from me, reply "stop" and I will not write again.

The email cites a public document, says what the firm does and asks who is managing the project. It does not say what any code requires or claim any energy result. If the firm has an owner who will act as a reference, offer it later.

Owners with approved projects show up in public agendas, and their capital teams are the people to reach. Rocketship can do the outreach: Emma finds the capital projects and facilities leaders at those owners, reads each organization's website, writes from your own Gmail, follows up and books the call. Start with the owners on this quarter's agendas during a 7-day free trial on every monthly plan, card required; the pricing page has plans.