A modular builder wins projects by showing a developer, an owner or a general contractor that the building will be finished sooner or with fewer surprises than site-built construction, and it loses them when the buyer does not believe the schedule or cannot see how the factory fits into the permit and the site work. Outbound for this kind of company is therefore a sales process for a few large decisions: a short list of named developers and owners, a message about a project type you have built, and a clear explanation of what the factory does and what the contractor on site still does.

Know what the buyer is comparing you with

A buyer deciding on modular is comparing a risk. The Modular Building Institute describes modular construction as a process in which a building is constructed off site under controlled plant conditions, with modules built to meet or exceed the same building codes and standards as site-built structures. That is the sentence a buyer needs to hear first, since a buyer may wonder whether a factory-built building is held to a lower standard. Be precise about the product you sell:

  • Permanent modular construction: modules joined into a building that stays on its foundation, built to the same codes as a site-built building.
  • Relocatable buildings: designed to be reused and moved, used for temporary space such as classrooms or offices.
  • Manufactured homes: a different category. The federal definition in 24 CFR 3280.2 describes a structure built on a permanent chassis to the federal construction and safety standards of that part. Do not mix this with modular in a message to a buyer who knows the difference.

The buyers and what each needs to hear

BuyerWhat they ownWhat your message must answer
Developer of multifamily, hotels or senior housingSchedule, financing cost, entitlement riskHow much shorter is the schedule on a project like mine, and how do you prove it?
Owner-operator such as a school district, health system or hotel brandA specific building, budget and deadlineWhat do I get and when, and who is accountable on site?
General contractorA project that must be built on time and to budgetWhere does the factory scope end and mine begin, and who coordinates?
ArchitectA design that has to be builtWhich design constraints does the factory need from me, and how early?

For the developer and builder side, our pages on how to sell to real estate developers and how to sell to general contractors cover what each reads in a first email.

What to lead with

  1. One project type you have actually built, with its size and your role. If you have not built one like it, say what you have built that is closest and offer a feasibility review.
  2. The schedule logic: what proceeds in the factory while the site is being prepared. Do not state a time saving as a fact for the buyer's project. Say you will give a schedule after reviewing the drawings.
  3. Scope boundaries: what your factory delivers, what is set and finished on site and who does each.
  4. Codes and approvals: how plans are reviewed and how your buildings are inspected where you sell. Rules differ by state, so name the states you work in and how each is handled, and say "we will confirm for your jurisdiction."
  5. Logistics: delivery distance and routes, since modules must be transported to the site.

Choosing the first fifty

Build a list of buyers whose project fits the factory: within delivery range, of a repeating type and with a visible plan. Signals that can be read from public sources include planning commission agendas listing a repeating unit type, announced projects with a date, a school district's capital plan and a hotel brand's new property announcements. For multifamily owners, see how to sell to multifamily property owners, and for finding who owns a given site, how to find commercial property owners.

Offering a feasibility note to a developer

Subject: A factory option for Hesper Quay's second phase

Hi Fenella, Hesper Quay's planning submission shows a second phase of three-story apartment buildings with repeating unit layouts. We build modular apartment buildings in our factory and deliver within a day's drive of it, and I would like to review the drawings for a feasibility note on how the layouts could be built in modules. I would send you the note with our assumptions listed. Who is reviewing construction methods for phase two?

Jorund
Ostland Modular Works, [street address, city, state, ZIP]

If you would rather not get emails from me, reply "stop" and I will not write again.

The email names a document the developer submitted, says what the company does and offers a note, not a promise. It does not state a time or cost saving. If you have a customer project that can be named, add one factual sentence about it in a later email.

A sales process that matches a long decision

StageWhat happensOutput
First conversationProject type, location, timing, who decidesA one page summary
FeasibilityYou review drawings and write a note with assumptionsThe note and a rough range for the factory scope
Factory visitThe buyer sees the plant and the work in progressA relationship with your team
ProposalScope, schedule, price, boundaries with the site contractorA written proposal
DecisionReview with the buyer's owner, lender and contractorA signed agreement or a reason

The sale takes months, but the first stage is a repeatable email to a short list, and Rocketship keeps that stage full. Emma finds the developers, owners and general contractors you describe, reads each company's website, writes from your own Gmail, follows up and books the call. Try the developers in one region during a 7-day free trial on every monthly plan, card required; the pricing page has plans.